FLoral Estate Logo Slide show banner
QUICK CONTACT
Name
Email ID
City
Country
Query
Mobile
CONTACT US
Mobile : +91 9560728100 /
              +91 9560728101

Email  : info@floralestate.com
              rajeshjha@floralestate.com
Search for New Property
Post your Requirements
FAQs
NRI Services
Apply for Loan
EMI Calculator
Floral Estate
Our Projects
» BPTP Park Floors


BPTP Park Floors, Faridabad
 
  • Overview
  • Location Map
  • Floor Plans
  • Site Plan
  • Specifications
  • Price List
  • Brochure
  • Application Form
  • Payment Plan

Park Floors I is a separate low-rise group housing projects, which is a part of Project Parklands. Park Floors I is proposed to be spread over approximately 13.19 acres of land with Saleable Area of 1.21 million sq ft.  The project offers 2 and 3 bedroom apartments in a ground plus four floors structure. The project will have surface parking with 75% of landscaped area. The project is designed by our in-house team of architects

Wall Finish
Internal
 
Living/Dining/Bed Rooms - Painted in pleasing shades of Oil Bound Distemper
Lobbies - Selected Marble/Granite Cladding
External Facade of Towers - Textured Paint Finish

Flooring 
Living/Dining - Porcelain Vitrified Tiles
Bed Rooms - Vitrified Tiles
Balcony - Anti Skid Ceramic Tiles
Lobby - Selected Granite/Marble

Kitchen 
Flooring - Ceramic Tiles
Dado - Ceramic Titles above working platform, rest Oil Bound Distemper
Platform - Granite Counter with single bowl stainless steel sink with drain board 

Toilets 
Dado - Selected Ceramic Titles
Floorings - Ceramic Tiles 
Fittings - Granite/Marble Counter, white sanitary fixtures & contemprory styled CP Fittings.

Doors & Windows 
Windows - Aluminium / UPVC
Doors - Seasoned hardwood frames with painted board shutters.

Facilities 
Electrical - Conduit Copper electrical wiring for all light and power points
100 % Power Backup - 3 KV 2BR/4 KVA 3 BR

External Areas 
Organised green landscaped areas.
Kids park
Jogging and walking track
Sitting areas
Adequate street lighting & open area lighting.

Building
Sufficient car parking facility
Earthquake resistant RCC framed constructions

Club
Recreational Club

Shopping
Convenient shopping centre for the residents.

*Architects and The Developer reserve the right to alter the specifications and facilities for design improvement.  

 

PARK FLOORS, Parklands, Faridabad Park Floor Sector-77     Park Floor Sector-76  
Towers Floor Area No. of Bedrooms Price (in Rs. / Lacs) PLC ( in Rs. / Lacs)   Price (in Rs. / Lacs) PLC ( in Rs. / Lacs)
G+3 Ground 1170 2 22.85 2.25   23.8 2.25
1st 1170 2 22.85 1   23.8 1
2nd 1170 2 22.85 n.a.   23.8 n.a.
3rd  1170 2 n.a n.a.   n.a. n.a.
G+3  
Ground 1414 3 27.45 2.25   28.55 2.25
1st 1414 3 27.45 1   28.55 1
2nd 1414 3 27.45 n.a.   28.55 n.a.
3rd 1414 3 25.45 1   26.55 1
   
G+5 G F 1045 2 20.4 2.25   21.25 2.25
1st 1045 2 20.4 1   21.25 1
2nd 1045 2 20.4 n.a.   21.25 n.a.
3rd 1045 2 17.72 n.a.   18.57 n.a.
4th 1045 2 17.72 n.a.   18.57 n.a.
5th 1045 2 17.72 1   18.57 1
   
G+5 G F 1275 3 n.a. n.a.   25.74 2.25
1st 1275 3 n.a. n.a.   25.74 1
2nd 1275 3 n.a. n.a.   25.74 n.a.
3rd 1275 3 n.a. n.a.   23.94 n.a.
4th 1275 3 n.a. n.a.   23.94 n.a.
5th 1275 3 n.a. n.a.   23.94 1
EDC/IDC : Rs 150/- per Sq.  Ft

 

Payment Plans for Park Floors, Sec 77

Construction Linked Payment Plan
   
Booking Amount 2 lacs (2 B/R) & 2.5 lacs (3 B/R)
Within 60 days of booking Complete 20% of BSP
Within 120 days 10% of BSP + 25% of EDC / IDC
Within 180 days 10% of BSP + 25% of EDC / IDC
Within 240 days 10% of BSP + 50% of EDC / IDC
At the start of foundation 10% of BSP + 25% of PLC
At the start of 2nd floor slab 10% of BSP + 25% of PLC
At the start of 3rd floor slab 10% of BSP + 25% of PLC
At the start of masonary work 10% of BSP + 25% of PLC
At the time of offer of possession 10% of BSP
   
Down Payment Plan (with 10% rebate)
   
At the time of booking 2 lacs (2 B/R) & 2.5 lacs (3 B/R)
Within 45 days of booking Complete 85% of BSP + 100% EDC / IDC + 100% PLC
At the time of offer of possession 5% of BSP