FLoral Estate Logo Slide show banner
QUICK CONTACT
Name
Email ID
City
Country
Query
Mobile
CONTACT US
Mobile : +91 9560728100 /
              +91 9560728101

Email  : info@floralestate.com
              rajeshjha@floralestate.com
Search for New Property
Post your Requirements
FAQs
NRI Services
Apply for Loan
EMI Calculator
Floral Estate
Our Projects
» Jaypee Greens Sports City


Jaypee Greens Sports City, Greater Noida
 
  • Overview
  • Location Map
  • Floor Plans
  • Site Plan
  • Specifications
  • Price List
  • Brochure
  • Application Form
  • Payment Plan

Jaypee Greens brings you an all-new way of living in the Lake District, a complete residential lakeside living, where every dwelling resides by the side of a perennially flowing lake. A perfect blend of residential options ranging from low, mid to high-rise apartments with breathtaking views all around. A whole new ocean of experience is inviting you. Plunge into it.

  • Upcoming Motor Racing Track spread over 875 acres. Ready by 2011
  • ICC Cricket Stadium with 1 lac seating capacity
  • 24 hours electric power supply from jaypee Group's own power generation plant
  • Regular water supply
  • Centrally monitored 3-tier security system
  • Super specialty medical facilities and educational facilities from kindercrib to primary school to professional colleges etc
  • The project site is located,20 mins south of Noida on the 165 Km long Yamuna Expressway,

    The Eastern Periphery Expressway connecting Greater Noida to Faridabad will come up on it’s

    west side. The Proposed metro link to Jewar from Greater Noida will run parallel to the Yamuna

    Expressway. And will connect to the mail link to Delhi. The Time taken from South Delhi is

    35 – 40 min (approx.)

 

Specifications

 

STRUCTURE R.C.C Framed Structure

AIRCONDITIONING Split a/c as per design & apartment

configuration

 

LIVING ROOM, DINING ROOM & LOUNGE

Floors Marble Flooring

External Doors and Windows Window- pre-engineered steel frame with wooden

shutters

Doors- flush doors

Walls Internal : Oil Bound Distemper

External : Good Quality external grade paint

Internal doors Enamel painted Flush doors

 

BEDROOMS & DRESS

Floors Laminated wooden flooring

External Doors and Windows Window- pre-engineered steel frame with wooden

shutters

Doors- flush doors

Walls Internal : Oil Bound Distemper

External : Good Quality external grade paint

Internal doors Enamel painted Flush doors

 

TOILETS

Floors Tiles

External Doors and Windows Window- pre-engineered steel frame with wooden

shutters

Doors- flush doors

Fixture and Fittings All provided of Standard Company make

Walls Tiles in cladding upto 7’ in shower area and 3’-6”

in balance areas, Balance walls painted in Oil

bound distemper

Internal doors Enamel painted Flush doors

 

KITCHEN

Modular Kitchen

Floors Marble Flooring

External Doors and Windows Window- pre-engineered steel frame with wooden

shutters Doors- flush doors

Fixture and Fittings Stone Top with sink

Walls Ceramic Tiles 2’-6” above counter, Balance walls

painted in Oil Bound Distemper

 

BALCONIES/ VERANDAH

Floors Tiles

Railings MS Railing as per Design

 

LIFT LOBBIES / CORRIDORS

Floors Ceramic / Mosaic Tiles / Marble / Kota or

equivalent

Walls Oil Bound Distemper

 

 

 

Additional features in Mid & Low-Rise

BEDROOM

Wardrobe Built in Wardrobes

 

ALL AREAS

Fittings Light fitting & fixtures

Kitchen & Bathroom Exhaust Fan

Rs 2430/- psf - High-Rise (G+9 to G+17)

Rs. 2850/- psf – Low-Rise / Mid Rise (G+3 to G+5 / G+7 to G+8)

 

Other Applicable Charges:

S. No. Payment Head Charges / Rate

1 Internal Development Charges Rs. 75.00 psf

2 Electric Sub Station Charges Rs. 40.00. psf

3 Social Club Membership Rs. 1.00 Lac

4 Car Parking

One reserved basement car parking

space compulsory with any apartment.

Underground Car Parking

1. Car park @ Rs 2.00 Lac

2. Subsequent car park @ Rs. 3.50 Lac

5. Interest Free Maintenance Deposit Rs. 50.00 psf

6. Maintenance Advance Rs. 1.50 psf per month

7. Preferential Location Charges*

Rs. 100.00 psf (G to 5th floor)

Rs. 60.00 psf (6th – 10th floor)

8. One time lease rent Rs. 50.00 psf

9. Transfer charges Rs. 25.00 psf

* The PLC is applicable only in case of high rise apartments

Notes:

1. The Basic Prices are for the indicated Super area and are not inclusive of charges for the reserved car parking

slot, land development charges, electric sub-station charges.

2. The Inaugural discount can be withdrawn at the sole discretion of the company at any point of time.

3. Additional amounts towards Stamp Duty, Registration Charges, and legal / miscellaneous expenses etc., shall

be payable by the Allottee at the time of offer of possession.

4. Maintenance charges as per maintenance agreement shall be payable by the allottee separately.

a. The interest free Maintenance deposit @ Rs. 50.00 per sq. ft. of super area shall be payable extra before

handing over possession of the premises to the allottee.

b. Maintenance charges for the first year shall be payable in advance at the time of offer of possession @ Rs. 1.50

psf per month.

5. Areas are indicative only.

6. Exact super area of Apartment shall be calculated at the time of handing over possession of property as

constructed. Increased / decreased area shall be charged proportionately as per the sale price.

7. The super area means the covered area of the demised premises inclusive of the area under the periphery

walls, area under columns and walls within the demised premises, half of the area of the wall common with

the other premises adjoining the demised premises, cupboards, plumbing / electric shafts of the demised

premises, total area of the balconies and terraces, and proportionate share of the common areas like common

lobbies, lifts, common service shafts, staircases, machine room, mumty, electric sub station and other services

and other common areas etc.

8. The other terms and conditions shall be as per the Application Form, Standard Terms and Conditions and

the Allotment Letter of the Company.

9. The prices are subject to revision / withdrawal at any time without notice at the sole discretion of the

Company.

10. Government Taxes as applicable from time to time shall be payable by the allottee in addition to the sale price

as stated above.

11. Transfer fees would be @ Rs.25 per sq ft & transfer would be allowed only after 30% of the payment has been

received from the allottee (subject to change, as per the company policy).

Payment Plan

PAYMENT PLAN 

 

A. Construction Linked Plan - High-Rise (G+9 to G+11)

S No Payment Due On % age Other applicable charges

1 Booking amount As applicable *

2 On or before 2 months of the Application

20% of BSP (Less

booking amount*)

3 On or before 4 months of the Application 10% of BSP

4 On commencement of excavation 10% of BSP

5 On laying of upper basement slab 10% of BSP PLC Charges as applicable

6 On laying of 1st floor Roof Slab 8.5% of BSP

7 On laying of 3rd floor Roof Slab 8.5% of BSP IDC Charges

8 On laying of 5th floor Roof Slab 7.5% of BSP

9 On laying of 7th floor Roof Slab 7.5% of BSP

10 On laying of top floor Roof Slab 7% of BSP Electric Sub Station charges

11

On completion of internal plaster & flooring

within the apartment

6% of BSP

12 On offer of possession 5% of BSP

Social Club Charges + IFMD

+ Lease rent + Car park

charges

TOTAL 100%

 

B. Construction Linked Plan - High-Rise (G+12 to G+15)

S No Payment Due On % age Other applicable charges

1 Booking amount As applicable *

2 On or before 2 months of the Application

20% of BSP (Less

booking amount*)

3 On or before 4 months of the Application 10% of BSP

4 On commencement of excavation 10% of BSP

5 On laying of upper basement slab 10% of BSP PLC Charges as applicable

6 On laying of 2nd floor Roof Slab 8.5% of BSP

7 On laying of 4th floor Roof Slab 8.5% of BSP IDC Charges

8 On laying of 6th floor Roof Slab 7.5% of BSP

9 On laying of 9th floor Roof Slab 7.5% of BSP

10 On laying of top floor Roof Slab 7% of BSP Electric Sub Station charges

11

On completion of internal plaster & flooring

within the apartment

6% of BSP

12 On offer of possession 5% of BSP

Social Club Charges + IFMD

+ Lease rent + Car park

charges

TOTAL 100%

 

C. Construction Linked Plan - High-Rise (More than G+15)

S No Payment Due On % age Other applicable charges

1 Booking amount As applicable *

2 On or before 2 months of the Application

20% of BSP (Less

booking amount*)

3 On or before 4 months of the Application 10% of BSP

4 On commencement of excavation 10% of BSP

5 On laying of upper basement slab 10% of BSP PLC Charges as applicable

6 On laying of 3rd floor Roof Slab 8.5% of BSP

7 On laying of 6th floor Roof Slab 8.5% of BSP IDC Charges

8 On laying of 9th floor Roof Slab 7.5% of BSP

9 On laying of 12th floor Roof Slab 7.5% of BSP

10 On laying of top floor Roof Slab 7% of BSP Electric Sub Station charges

11

On completion of internal plaster & flooring

within the apartment

6% of BSP

12 On offer of possession 5% of BSP

Social Club Charges + IFMD

+ Lease rent + Car park

charges

TOTAL 100%

 

D. Construction Linked Plan - Mid-Rise (G+7 to G+8)

S No Payment Due On % age Other applicable charges

1 Booking amount As applicable *

2 On or before 2 months of the Application

20% of BSP (Less

booking amount*)

3 On or before 4 months of the Application 10% of BSP

4 On commencement of excavation 10% of BSP

5 On laying of upper basement slab 10% of BSP PLC Charges as applicable

6 On laying of 1st floor Roof Slab 10% of BSP

7 On laying of 3rd floor Roof Slab 8.5% of BSP IDC Charges

8 On laying of 5th floor Roof Slab 8.5% of BSP

9 On laying of top floor Roof Slab 9% of BSP Electric Sub Station charges

10

On completion of internal plaster & flooring

within the apartment

9% of BSP

11 On offer of possession 5% of BSP

Social Club Charges + IFMD

+ Lease rent + Car park

charges

TOTAL 100%

 

E . Construction Linked Plan - Low-Rise (G+3 / G+5)

S No Payment Due On % age Other applicable charges

1 Booking amount As applicable *

2 On or before 2 months of the Application

20% of BSP (Less

booking amount*)

3 On or before 4 months of the Application 10% of BSP

4 On commencement of excavation 10% of BSP

5 On laying of upper basement slab 10% of BSP PLC Charges as applicable

6 On laying of 1st floor Roof Slab 10% of BSP

7 On laying of 3rd floor Roof Slab 10% of BSP IDC Charges

9 On laying of top floor Roof Slab 10% of BSP Electric Sub Station charges

10

On completion of internal plaster & flooring

within the apartment

10% of BSP

11 On offer of possession 10% of BSP

Social Club Charges + IFMD

+ Lease rent + Car park

charges

TOTAL 100%

* Booking Amount:

2 BHK / 2 BHK + W / 2 BHK + study - Rs. 2.00 Lac

3 BHK / 3 BHK + W - Rs. 3.00 Lac

4 BHK / 4 BHK + W – Rs. 4 Lac

Cheque should be drawn in favour of ‘JPSK SPORTS PRIVATE LIMITED’

Notes: 1. Installments under S. No. 4 – 12 / 4-10 may run concurrently with those under S. No. 1 - 3 based

on the physical progress of work at site.

2. The demand letter for Installments at S. No. 4 – 12 / 4-10 shall be sent in advance providing for

payment period of up to 15 days.

 

 

B. Down Payment Plan

S No Payment Due On % age Other applicable charges

1 Booking amount As applicable *

2 On or before 1 month of the Application

95% of BSP (Less

booking amount*)

IDC + Electric substation

charges + PLC Charges as

applicable

3 On offer of possession 5%

Social Club Charges +

IFMD + Lease rent + Car

park charges

TOTAL 100%

Note: Down Payment Discount: @ 15% on BSP

Location Map

The project site is located,20 mins south of Noida on the 165 Km long Yamuna Expressway,

The Eastern Periphery Expressway connecting Greater Noida to Faridabad will come up on it’s

west side. The Proposed metro link to Jewar from Greater Noida will run parallel to the Yamuna

Expressway. And will connect to the mail link to Delhi. The Time taken from South Delhi is

35 – 40 min (approx.)